
Construction & engineering — since 2016 — Côte d’Ivoire
Reference list
Edition : November 2026
34projects in the portfolio
6Under construction
6In design
20+staff, 4 divisions
General Constructor Group is a construction and engineering company. We support our clients in delivering their projects, from feasibility, architectural and engineering studies through to construction.
Residential & offices15
| No. | Project | Location | Period | Area | Programme | GCG scope | Status |
|---|---|---|---|---|---|---|---|
| 01 | Green City | Grand-Bassam | 2025 | 2,500 m² | A gated community of 45 high-end villas. | Engineering studies, design and construction ; Structural and finishing works ; Landscaping and infrastructure | Under construction |
| 02 | Villa Palmeras | Grand-Bassam | 2023 | 33,000 m² | Construction of 116 two-storey (R+1) high-end villas. | Engineering studies and construction ; Structural and finishing works ; Interior and exterior fit-out | Under construction |
| 04 | Projet Élan | Bassam Modeste | 2026 | 14 hectares (600,000 m² built) | Residential complex of 28 seventeen-storey (R+16) towers. | Architectural design ; Engineering studies | In design |
| 12 | Marikati building | Vallon | 2020 | 6,800 m² | Mixed-use office and residential building. | Architectural design ; Engineering studies | |
| 13 | Belle Feuille building | Attoban | 2021 | 5,000 m² | Five-storey (R+4) building with 18 apartments. | Architectural and engineering design of an R+4 building | |
| 14 | Attoban complex | Attoban | 2021 | 7,800 m² | Complex of three mixed-use office and residential buildings. | Architectural design ; Engineering study | |
| 16 | Assouindé luxury villa | Assouindé | December 2025 | 260 m² | Turnkey high-end villa. | Design and engineering studies ; Construction ; Fit-out ; Swimming pool | |
| 23 | Beverly Hills villa | Riviera Golf | 2025 | 600 m² | High-end villa with a swimming pool. | Engineering study ; Finishing works ; Landscaping | Under construction |
| 24 | Beverly Hills private luxury residence | Riviera Golf | 2025 | 1,200 m² | Turnkey project of 3 luxury villas. | Engineering studies, design and construction ; Structural and finishing works ; Interior and exterior fit-out | Under construction |
| 26 | Abatta residence | Abidjan | 2026 | 8,000 m² (8,700 m² built) | High-end residential villas: two urban villa prototypes and a four-storey (R+3) building. | Architectural and engineering design ; Interior and exterior fit-out | In design |
| 27 | Assinie Mafia residence | Assinie | 2025 | 1,200 m² | Upscale residential villas: three urban villa prototypes and a lagoon villa. | Architectural and engineering design ; Interior and exterior fit-out | In design |
| 31 | Villa Palmerais | Riviera Palmeraie | 2019 – 2020 | 1,100 m² | Turnkey project of 3 two-storey (R+1) high-end villas. | Architectural and engineering design, construction ; Structural and finishing works ; Interior and exterior fit-out | |
| 32 | Seven 1 building | Angré, 7th phase | 2018 – 2020 | 3,000 m² | Completion of finishing works on a five-storey (R+4) building. | Finishing works | |
| 33 | Seven 2 building | Angré, 8th phase | 2019 – 2021 | 4,000 m² | Turnkey six-storey (R+5) building with mezzanine — 17 high-end apartments. | Structural and finishing works ; Interior and exterior fit-out | |
| 34 | Koné office building | Vallon | Apr. – Dec. 2020 | 600 m² | Turnkey three-storey (R+2) high-end office building. | Structural and finishing works ; Interior and exterior fit-out |
Hospitality & tourism11
| No. | Project | Location | Period | Area | Programme | GCG scope | Status |
|---|---|---|---|---|---|---|---|
| 03 | Hôtel Calao, Korhogo | Korhogo | 2020 – 2024 | 4,000 m² | Turnkey four-storey (R+3) hotel with 42 high-end rooms. | Design and engineering studies ; Construction and fit-out | Handed over |
| 05 | Spa Assinie | Assinie | 2020 – 2023 | 1,200 m² | Leisure and wellness centre with spa. | Design ; Turnkey construction | |
| 06 | Hôtel Akwabeach | Assouindé | 2025 | 2,500 m² | Refurbishment of a four-star hotel. | Renovation and modernisation of interiors ; Rehabilitation of infrastructure and equipment ; Upgrade of amenities and fittings | Under construction |
| 09 | Royal Palm | Assinie | 2018 | 2,200 m² | Eight high-end holiday villas. | Architectural design ; Structural engineering ; Structural works ; Finishing works ; Landscaping | |
| 10 | Beach Bar Assinie | Assinie | 2022 | 800 m² | Beach restaurant and bar with an infinity pool. | Architectural design ; Structural engineering ; Structural works ; Finishing works ; Landscaping | |
| 11 | Palm Village | Assinie | 2022 | 1,600 m² | Residential complex of 4 villas and 8 apartments. | Structural engineering ; MEP engineering (plumbing and electrical) ; Structural and finishing works ; Furnishing and interior layout | |
| 15 | Assouindé hotel suites | Assouindé | Sept. 2024 – Feb. 2025 | 400 m² | Turnkey project of 3 suites and 5 rooms. | Engineering studies, construction and fit-out | |
| 20 | Hotel complex upgrade | Assouindé | Aug. – Oct. 2024 | Fire detection and fire-fighting systems. | Upgrade of electrical and plumbing installations ; Technical compliance of the site | ||
| 25 | Palm Resort phase 2: Mövenpick | Assouindé | 2025 | 5 hectares | 64 bungalows, 30 high-end villas, a conference hall and a main building. | Building permit application | In design |
| 28 | Family holiday resort | Assinie | 2026 | Redevelopment of a seaside site in an exceptional setting between lagoon and ocean. | Architectural design | In design | |
| 30 | Hôtel du Golf, Abidjan | Riviera Golf | 2020 | Tourist resort complex. | Feasibility study |
Facilities & leisure4
| No. | Project | Location | Period | Area | Programme | GCG scope | Status |
|---|---|---|---|---|---|---|---|
| 08 | Multipurpose hall | Korhogo | 2022 | 800 m² | Turnkey multipurpose hall for ceremonies and events. | Design and engineering studies ; Construction ; Fit-out | |
| 17 | Progym fitness centre | Cocody | Mar. – Dec. 2017 | 800 m² | Refurbishment of a fitness centre. | Finishing works | |
| 22 | Indian temple | Grand-Bassam | 2023 | 2,500 m² | Two-storey (R+1) temple. | Engineering studies and construction ; Structural and finishing works ; Architectural and decorative fit-out | Under construction |
| 29 | Green City school | Bassam Modeste | 2026 | 3,810 m² | Three-storey (R+2) primary school with a pool and 3 padel courts. | Engineering studies and architectural design | In design |
Industry & infrastructure4
| No. | Project | Location | Period | Area | Programme | GCG scope | Status |
|---|---|---|---|---|---|---|---|
| 07 | SAIF Ivoire pharmaceutical plant | VITIB free zone | 2020 – 2021 | 3,500 m² | Construction of a steel-frame pharmaceutical plant. | Engineering studies and construction | |
| 18 | Pharmanova pharmaceutical plant | VITIB free zone | Feb. – Dec. 2018 | 4,200 m² | Construction of a steel-frame pharmaceutical plant with a mezzanine. | Engineering studies and construction | |
| 19 | Cité Baobab roads and utilities | Grand-Bassam | Jun. – Nov. 2023 | 5 hectares | Roads and utilities for a residential estate: the SIDI Baobab estate. | Roads and utility networks (VRD) ; Roads, drainage and utility networks ; Infrastructure and equipment works | |
| 21 | Cashew plant | Attingué | 2025 | 55,000 m² | Cashew storage plant. | Engineering study ; Analysis and design of the installations |